Description Der mehr als 500 Meter Betonierzug im Tunnel. Jeden Tag gehts 220 Meter vorwärts.
Date
Source Einbau der Bahntechnik im Gotthard-Basistunnel
Author Alpiq AG from Olten, Schweiz
Camera location46° 50′ 37.73″ N, 8° 38′ 35.96″ E Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Category:Files with coordinates missing SDC location of creation

Licensing

w:en:Creative Commons
attribution
This file is licensed under the Creative Commons Attribution 2.0 Generic license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
Category:CC-BY-2.0#Einbau%20der%20Bahntechnik%20im%20Gotthard-Basistunnel%20(6883311244).jpg
This image was originally posted to Flickr by Alpiq AG at https://flickr.com/photos/42590860@N03/6883311244. It was reviewed on 2 June 2016 by FlickreviewR and was confirmed to be licensed under the terms of the cc-by-2.0.

2 June 2016

Category:Flickr images reviewed by FlickreviewR#Einbau%20der%20Bahntechnik%20im%20Gotthard-Basistunnel%20(6883311244).jpg Category:Construction of Gotthard Base Tunnel
Category:CC-BY-2.0 Category:Construction of Gotthard Base Tunnel Category:Files with coordinates missing SDC location of creation Category:Flickr images reviewed by FlickreviewR