File:Sapang Maragul Bridge Sluice Gate CNE 07.jpg
Summary
| Description |
English: August 7, 2024, BongBong Marcos merely inaugurated the ₱7.57 Billion Integrated Disaster Risk Reduction and Climate Change Adaptation (IDRR-CCA) Measures in Low-Lying Areas of Pampanga Bay |
| Date | |
| Source | Own work |
| Author | CNEcija12345 |
Stage I, Department of Public Works and Highways Pampanga - Official Development Assistance (ODA) Republic of Korea under Loan Agreement No. PHL-17 Korean Economic Development Cooperation Fund (KEDCF) - river channel networks - Third River, Eastern Branch Channel, Caduang Tete River, Sapang Maragul River ributaries of the Pampanga River all flows to the Pampanga Bay (This is President Rodrigo Roa Duterte Build Build Build Project since 2020 - dredging Sapang Maragul River 1.2 kilometer concrete slope protection with PVC sheet pile construction of Sapang Maragul Sluice Gate in Masantol, Pampanga by DPWH Secretary Roger G. Mercado)
Licensing
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.