File:Probability metrics.svg

Summary

Description
English: Probability of base call errors. Relationship between Q and p using the Sanger (red) and Solexa (black) equations. The vertical dotted line indicates p = 0.05, or equivalently, Q ≈ 13. For more information, see FASTQ_format
Source Own work
Author Sealox

Licensing

Public domain I, the copyright holder of this work, release this work into the public domain. This applies worldwide.
In some countries this may not be legally possible; if so:
I grant anyone the right to use this work for any purpose, without any conditions, unless such conditions are required by law.
Category:Self-published work#Probability%20metrics.svgCategory:PD-self#Probability%20metrics.svg Category:Diagrams Category:Biotechnology Category:Numerical analysis
Category:Biotechnology Category:Diagrams Category:Numerical analysis Category:PD-self Category:Self-published work